Recommendations
Open / In Progress | Feedback/evidence from the Railway Organisation is pending; or, actions have not yet been completed. |
---|---|
Submitted | The Railway Organisation has made a submission to the CRR advising that it has taken measures to effect the recommendation and the CRR is considering whether to close the recommendation. |
Further Evidence Requested | The CRR has reviewed a submission (or further submission) but considers that further evidence is necessary to close the safety recommendation. |
Closed | The CRR has reviewed a submission (or further submission) and is satisfied that the safety recommendation has been addressed. |
06 July 2022
Open / In progress2023003-03:
Collision of an RRV Dumper with a member of Iarnród Éireann infrastructure maintenance staff, Tivoli, Cork, 6th July 2022
IÉ-IM should produce and circulate a policy document for the use of phones and all handheld …
06 July 2022
Open / In progress2023003-02:
Collision of an RRV Dumper with a member of Iarnród Éireann infrastructure maintenance staff, Tivoli, Cork, 6th July 2022
IÉ-IM CCE should re-examine the risk assessment related to RRV movements, where previous control …
06 July 2022
Open / In progress2023003-01:
Collision of an RRV Dumper with a member of Iarnród Éireann infrastructure maintenance staff, Tivoli, Cork, 6th July 2022
IÉ-IM PTS Certification training should include training on the head lights and tail lights for …
27 August 2021
Open / In progress2023002-07:
Collision with track equipment between Newbridge and Kildare, 27th August 2021
The CCE Department review and update CCE-SMS-001 and CCE-SMS-008 with a view to addressing the …
27 August 2021
Open / In progress2023002-06:
Collision with track equipment between Newbridge and Kildare, 27th August 2021
IÉ-IM should conduct a full review on the reporting of accidents by IÉ-IM staff and contractors, …
27 August 2021
Open / In progress2023002-05:
Collision with track equipment between Newbridge and Kildare, 27th August 2021
The IÉ CCE Department (Engineering Department Division 3) should ensure the requirements of …
27 August 2021
Open / In progress2023002-04:
Collision with track equipment between Newbridge and Kildare, 27th August 2021
IÉ-IM should introduce processes to ensure that information submitted to the RAIU is correct and …
27 August 2021
Open / In progress2023002-03:
Collision with track equipment between Newbridge and Kildare, 27th August 2021
IÉ-IM should promote a positive culture between staff, at different grades, to ensure ground level …
27 August 2021
Open / In progress2023002-02:
Collision with track equipment between Newbridge and Kildare, 27th August 2021
IÉ-IM should review the current system of supervising and monitoring T3 Possessions, in terms of …
27 August 2021
Open / In progress2023002-01:
Collision with track equipment between Newbridge and Kildare, 27th August 2021
IÉ-IM should consider developing a system, whereby Signalmen must provide a Unique Possession …
07 December 2021
Open / In progress2023001-12:
Dangerous occurrence involving a Double SPAD at Clontarf Road Station, 7th December 2021
IÉ-RU Ops should brief all drivers on the importance of making an open call in an emergency …
07 December 2021
Open / In progress2023001-11:
Dangerous occurrence involving a Double SPAD at Clontarf Road Station, 7th December 2021
IÉ-RU Ops should update its competency assessment processes to ensure that the assessments carried …
Showing 1 - 12 of 277