Basis for Recommendation
The infrastructure at the end of the platforms was ineffective at deterring passengers from accessing the railway line.
back to recommendations listing
Ref # | SAN 002 - 05 |
---|---|
Status | Open / In progress |
Occurrence | SAN 002 - Track access by the public at Navan Road Parkway on the 31st January 2025 |
Occurrence Date | 31 January 2025 |
The infrastructure at the end of the platforms was ineffective at deterring passengers from accessing the railway line.
IÉ-IM Chief Civil Engineer (CCE) should review current signage located at the platform ramps, with a view to having the signage clearly portray the hazard (i.e. the passenger is accessing a live railway line) and indicates the severity of not adhering to the warning (i.e. possible collision with a train).