Basis for Recommendation
The investigation identified that whilst the holding track feature on the Mainline CTC workstation was not identified as significant factor in the incident and the behaviour of the system was known by signalmen. The risk of this feature masking a genuine fault or track circuit occupation was not included in training or briefing materials.